Offsite building options
Structural panels with an integrated insulation core.
A practical guide to your package
SIPs combine an insulating core with structural face sheets bonded together as a composite panel. A designed assembly can form walls and roofs; joints, supporting members and connections are part of the system.
The insulation is integral to the panel. It is not a finished wall or roof: the complete construction still needs the specified weather layers, joints, linings, service arrangements and external finishes.
The project starts with a coordinated design. The specialist supplier develops the panel arrangement, openings and connections within its agreed engineering scope.
Panels are manufactured or prepared offsite, then delivered for assembly. Installation connects the panels to the foundations and to one another, following the engineered details.
The building then requires the remaining elements of its specification. These may include roof coverings, external finishes, windows, doors, internal linings, services and fit-out.
Factory preparation reduces some site operations; it does not remove the need for skilled installation and coordination.
A conventional timber-frame panel relies on an arrangement of framing members, with insulation incorporated into the wall build-up.
A SIP combines its facings and insulation core as an engineered structural panel. This changes how the structure, connections and building envelope are designed.
The comparison should cover the complete package: structure, insulation, junctions, installation and subsequent works. Panel thickness alone does not establish which system will give the best result.
Insulation limits heat transfer through the building fabric.
Airtightness limits uncontrolled air leakage through gaps and junctions.
Ventilation provides the planned exchange of indoor and outdoor air.
These are related but different requirements. Good insulation does not compensate for poorly executed joints, and an airtight building still needs an appropriate ventilation strategy.
A heat-recovery ventilation system may be considered as part of the design, but it should not be presented as automatically included in every SIP package. Heating, ventilation and summer comfort need coordinated attention.
Houses, extensions, garden buildings and some light commercial projects with an appropriate engineered design. Roof panels can support useful roof-space layouts, but permitted spans, openings and supports depend on the selected system.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Fix the panel type, overall thickness, roof geometry and large openings early. Plan service zones and penetrations: panels must not be cut or chased on site without the designer’s agreement. Airtightness depends on joint detailing and installation, not panels alone.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
Cut wall and/or roof panels; system splines and connection components; specified structural supports; sealants and fixings where scheduled; panel layouts and the agreed engineering package.
Roof coverings; external cladding; internal fire-protective linings; service battens and electrical/plumbing work; windows and doors unless scheduled; additional insulation or membranes required by the final build-up.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.
View the checklist