Items to include in the quotation
Cut and formed steel sections or assembled panels; scheduled joists, bracing and connections; frame layouts; agreed design calculations and identification of components.

Offsite building options
Precision-manufactured framing for suitable building projects.
A practical guide to your package
Thin galvanised steel sections are formed into studs, tracks and joists. They can arrive as individual members, prefabricated panels or larger assemblies. Load-bearing framing and non-load-bearing infill are different design uses.
This is not the same as a heavy steel portal frame. Thermal performance comes from the complete wall build-up, including how insulation and junctions limit heat transfer through the steel.
Residential, extension and commercial projects where a light, accurately coordinated frame is suitable. It can also form infill walls within another main structure; the designer must identify which elements carry the building loads.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Provide the framing role, storey heights, openings, floor build-ups and cladding loads. Coordinate thermal breaks, corrosion exposure, fixing types and connections to foundations or the primary structure. The frame alone does not establish the fire rating of a complete wall.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
Cut and formed steel sections or assembled panels; scheduled joists, bracing and connections; frame layouts; agreed design calculations and identification of components.
Primary heavy steelwork unless listed; insulation and sheathing not scheduled; cavity barriers, linings, cladding, roofing and services; fire and acoustic treatments beyond the stated frame package.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.
View the checklist