Items to include in the quotation
Scheduled wall, floor or roof units; pre-cut service openings where designed; connection components; panel identification, erection layouts and defined engineering deliverables.

Offsite building options
Coordinated building elements assembled on site.
A practical guide to your package
Flat building elements are prepared off site and assembled into the building on site. Panels may use timber, steel or another designed construction. Floors and roofs are often supplied as cassettes: preassembled structural units.
Panelisation and timber frame or SIPs can overlap. Ask what each panel actually contains and how complete it is; two suppliers using “panelised” may offer very different scopes.
Projects needing repeatable wall, floor or roof elements while retaining more flexibility in transport and on-site assembly than whole-room modules. The term describes the delivery format rather than a single material or performance standard.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Coordinate panel sizes with transport, lifting weights and site storage. Agree allowable tolerances, temporary support and the sequence in which floors, walls and roofs become stable. Confirm who completes and inspects the joints.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
Scheduled wall, floor or roof units; pre-cut service openings where designed; connection components; panel identification, erection layouts and defined engineering deliverables.
Layers, openings or service installations not shown on the schedule; site finishing at joints; temporary bracing, lifting equipment or access unless included; making the complete building weatherproof.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.
View the checklist