Offsite Kit Supply • planning guide

Package Inclusions & Responsibilities

Know what your supply package contains and who completes the remaining work.

Plan your package

Package Inclusions & Responsibilities

A clear scope helps you compare quotations and avoid gaps between trades. Define components, design responsibilities, delivery and installation before ordering.

What does the kit include?

“Kit” describes a package, not a fixed list of everything needed for a building. BPM will define a project-specific schedule so you can compare the supply price with the full cost of getting the building ready for use.

Confirm in the package

  • Components, quantities and material specification.
  • Design drawings, calculations and the limits of supplier design.
  • Connections, fixings and membranes or insulation, where specified.
  • Delivery arrangements and installation, if included.
  • Inspection, warranty and handover information to be provided.

Arrange separately unless listed

  • Surveys, architectural design and relevant approvals.
  • Foundations, drainage and below-ground works.
  • Access, unloading, crane, scaffolding and temporary works.
  • Weatherproofing, windows, cladding and roof coverings outside the scope.
  • Internal finishes, services, connections and final commissioning.

Foundations may be a slab, strips, piles or another engineered solution. Ground screws and pads are not suitable for every structure or site; the foundation designer must establish the right approach.

Choose the level of support you need

Supply only

A defined component package. You appoint and coordinate site works, unloading, lifting and installation except for services specifically included in the order.

Supply and installation

An agreed supply package with a named installation scope. Groundworks, site access, crane provision and the point at which responsibility transfers must still be set out.

Project management

A separate agreed management service can coordinate the wider programme, trades and handover. It does not automatically turn a kit quotation into a complete building contract.

Decisions to make before placing an order

Choose the building outcome first: use, layout, appearance, performance and budget. Then compare the complete route to delivery rather than just the kit price. Ask each supplier for the same schedule of design, components, transport, installation and exclusions.

Agree a design responsibility schedule and a clear point for releasing manufacture. Check site readiness and supplier lead times together. Record how changes, defects, warranties and information for the next trade will be handled.