Items to include in the quotation
An agreed schedule of components from each specialist; interface drawings; connection details; defined coordination responsibilities and supplier design information.

Offsite building options
A coordinated combination of building systems.
A practical guide to your package
A hybrid project combines complementary systems rather than using one structural solution everywhere. Examples include a steel frame with timber floors, a concrete base with light-frame upper levels, or panels combined with room modules.
The interfaces determine whether the combination works: dimensions, tolerances, movement, load transfer and build sequence must be agreed between the system designers.
Projects with different requirements across the building, such as open commercial space below smaller rooms, mixed spans or a combination of new and existing construction. It is a coordinated design strategy, not a standard off-the-shelf kit.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Provide a coordinated design model or drawing set and identify the lead designer. Agree one interface schedule covering levels, supports, connections, movement, fire stopping, weathering and who signs off each element before manufacture.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
An agreed schedule of components from each specialist; interface drawings; connection details; defined coordination responsibilities and supplier design information.
Anything outside each specialist’s stated boundary; interface work without an assigned owner; temporary works, cranes, external finishes and services unless allocated in the package.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.
View the checklist