Items to include in the quotation
The specified pod structure; scheduled fittings and finishes; defined factory-installed services; factory inspection or test records and stated connection points.

Offsite building options
Prefabricated facilities for larger building projects.
A practical guide to your package
A pod is a prefabricated room or service assembly installed within a larger building. Bathroom pods can contain sanitary fittings and finishes; other service modules can contain coordinated equipment or distribution systems.
A pod is usually a component within the host building, not a self-contained building. The structural frame, access route, surrounding fire and acoustic construction and external service connections still need designing.
Hotels, student accommodation, residential schemes and other projects with repeated layouts. The value depends on repetition, specification stability and clear connections to the main building; a one-off room may suit conventional fit-out better.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Confirm quantities, room layouts, door clearances, floor recesses and connection positions before procurement. Plan how pods enter the building, their installation stage, replacement access and responsibility for final testing and defects.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
The specified pod structure; scheduled fittings and finishes; defined factory-installed services; factory inspection or test records and stated connection points.
The host structure; building-wide supply, drainage and ventilation; final connections and commissioning not specified; site lifting, corridor making-good and enclosing construction unless listed.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.