Offsite Kit Supply • planning guide

Design, Delivery & Installation

A practical route from initial enquiry to an installed and inspected package.

Plan your package

Design, Delivery & Installation

Offsite delivery works best when design, factory preparation and site readiness follow one coordinated programme. Use the stages below to understand what needs deciding and who needs to act.

From your drawings to installation

  1. 1. Understand the brief

    Share the intended use, site and drawings. We discuss the systems and the level of support you need. Early enquiries can start with sketches, with missing information identified.

  2. 2. Agree scope and responsibilities

    The proposal records the design stage, specification, inclusions, exclusions and who supplies foundations, access, transport, lifting and installation. Compare quotations on the same basis.

  3. 3. Coordinate and approve the design

    The appointed designers resolve structural details, interfaces and openings. Agree the latest drawing revisions and who authorises manufacture. Changes after this point can affect price and lead time.

  4. 4. Manufacture and prepare the site

    Factory preparation follows the agreed release. In parallel, the site team completes foundations, checks levels and tolerances, arranges access and confirms safe lifting and temporary support.

  5. 5. Deliver and assemble

    Deliveries follow an agreed sequence. Check the load, unloading responsibilities, storage protection and installation plan. The named installer erects and connects the components to the approved information.

  6. 6. Inspect and hand over

    Record inspections and remaining items, gather the agreed design and product information, and confirm what must happen before finishes, service commissioning or occupation. Delivery of a kit is not completion of the whole building.

Why consider offsite?

Factory preparation can make work more repeatable and allow some site preparation to run alongside manufacture. Planned component deliveries can also reduce some cutting and assembly on site. These advantages must be assessed against early design decisions, factory lead times, transport, lifting and the work that remains after the kit is installed. There is no universal cost or programme saving.