Items to include in the quotation
Scheduled precast elements; specified reinforcement and cast-in features; manufacturing drawings; component design information and lifting details within the agreed scope.

Offsite building options
Specialist factory-produced structural building elements.
A practical guide to your package
Concrete elements are cast in a controlled manufacturing environment, cured and delivered to site. These can include floors, beams, columns, walls or stairs; not every project needs a complete precast building system.
Precast units arrive as discrete heavy components. Bearings, joints and temporary stability are as important as the concrete element itself; some systems also require site-applied topping or grouting.
Repetitive structural layouts, flooring and stairs, and projects where the weight, spans, robustness or architectural finish suit the design. Feasibility depends on load paths, transport and the ability to lift and support the elements.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Confirm loads, spans, bearing dimensions, openings and the finish specification. Plan delivery sequence, crane capacities and locations, access for heavy vehicles and the installation sequence with the specialist designer.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
Scheduled precast elements; specified reinforcement and cast-in features; manufacturing drawings; component design information and lifting details within the agreed scope.
Supporting foundations or structure; site bearings and grouting not included; topping, waterproofing, finishes and service work; cranes, propping and temporary works unless expressly listed.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.
View the checklist