Items to include in the quotation
Specified modules; agreed factory finishes and fitted equipment; module connection details; factory inspection records; transport and lifting only if expressly included.

Offsite building options
Factory-produced three-dimensional building modules.
A practical guide to your package
Three-dimensional units are made in a factory and transported to site, where they are positioned and connected. Depending on the contract, modules may contain structure, internal finishes and fitted services before delivery.
A module can be highly finished, but “modular” does not automatically mean turnkey. Foundations, service connections and work between modules can still form substantial separate packages.
Repetitive layouts such as accommodation, offices and education or healthcare facilities, as well as some bespoke buildings. Suitability depends particularly on transport dimensions, delivery access, lifting positions and the completed building design.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Agree the internal fit-out schedule and approval samples before production. Check the full delivery route, vehicle dimensions, crane reach, ground bearing capacity and connection sequence. Late changes can affect multiple completed factory elements.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
Specified modules; agreed factory finishes and fitted equipment; module connection details; factory inspection records; transport and lifting only if expressly included.
Groundworks and foundations; incoming utilities and drainage; roads and external works; site cranage or traffic management not included; final connections, testing and work at module joints unless scheduled.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.