Items to include in the quotation
Engineered panels, beams and/or columns; agreed factory machining; scheduled metal connections; fabrication drawings and the defined structural engineering package.

Offsite building options
Specialist timber panels, beams and structural packages.
A practical guide to your package
Cross-laminated timber (CLT) uses timber layers bonded with adjacent layers generally running across one another to form large structural panels. Glued laminated timber (glulam) bonds laminations broadly along the member to create structural beams or columns.
CLT panels and glulam beams perform different jobs and can be combined. Exposed timber appearance, visual grading and protection during construction need to be specified rather than assumed.
CLT can form designed walls, floors and roofs. Glulam can support longer spans, larger openings and exposed structural features. These are engineered structural products; the appropriate member and connection design depends on the building.
Preparing repeatable components away from the site can support planned deliveries, consistent fabrication and clearer installation sequencing. The result depends on coordinated design, competent installation and the whole building specification.
Provide spans, loads, openings and the desired visual finish. Coordinate penetrations before machining, connection access, moisture protection during transport and erection, and the full fire and acoustic build-ups. Do not assume an exposed structure meets every performance requirement on its own.
The following is a scope checklist, not a standard promise of inclusion. The quotation identifies what is supplied, who designs it and who installs it.
Engineered panels, beams and/or columns; agreed factory machining; scheduled metal connections; fabrication drawings and the defined structural engineering package.
Acoustic floor layers; fire-protective linings where needed; weather protection, finishes and temporary protection not scheduled; lifting equipment and installation unless itemised.
Foundations, drainage, surveys, approvals, site access and utilities also require allocated responsibility. A structural kit is not a finished, occupiable building.
The base must suit both your chosen building system and the ground. Concrete foundations, pads, ground screws and piles are different options, not interchangeable standard bases. Foundation design, groundworks and base acceptance need agreed responsibilities before kit delivery.
Explore foundation optionsCheck inclusions and the work arranged separately.
Understand the packageSee how design, manufacture and site readiness connect.
Follow the processGather the information BPM needs to discuss your project.
View the checklist