Offsite Kit Supply • planning guide

Compare Building Systems

Understand what arrives on site and which system may suit your building.

Plan your package

Compare Building Systems

Some options overlap: panelised describes a delivery format, while timber frame, SIPs and steel describe different structural approaches. Start with your building’s use and layout, then compare the complete package.

Compare the building systems

Start with the building’s use and design, then compare the packages. These are options to discuss, subject to specialist design, supplier availability and the agreed scope.

SystemWhat arrivesUseful starting point
Timber frameTimber wall panels and scheduled structural components.Homes, extensions and suitable low-rise buildings.
SIPsStructural panels with a bonded insulation core.Designed wall and roof packages.
Light steel frameCold-formed steel members or panels.Load-bearing framing or non-load-bearing infill.
Modular buildingsThree-dimensional units with an agreed level of fit-out.Projects where transport, cranage and repeated layouts suit modules.
Panelised systemsFlat wall, floor or roof assemblies.Projects assembled from coordinated two-dimensional elements.
CLT & glulamStructural timber panels, beams or columns.Designed panel structures, spans and architectural timber features.
Precast concreteFactory-cast floors, walls, beams, stairs or other components.Projects suited to heavy component delivery and lifting.
Hybrid systemsA coordinated combination of materials and systems.Buildings with different structural or layout needs.
Bathroom & service podsFitted rooms or service assemblies placed within a host building.Repeated room layouts and coordinated service installations.

Your next step

Let’s talk about your project