Foundation Options Explained

Understand the base beneath your building, the work involved and who is responsible.

A clear starting point for your site

The right foundation starts with your ground and your building.

Start with the building and the ground

Foundations transfer the building’s weight and other structural loads safely into the ground. They must work with the ground conditions, the building’s structural design and its connection details. The foundation and floor are related, but they are not always the same construction.

An offsite building still needs a properly designed base. A lighter structure may allow different options, but it does not automatically make ground screws, pads or a shallow concrete base suitable.

Foundation options explained

Concrete slab or raft

A ground-bearing concrete floor slab supports the floor on the ground; it is not automatically the foundation supporting the walls or columns. A designed raft spreads structural loads over a wider area. The engineer specifies reinforcement, edges, ground preparation and connections for the selected design.

Strip or trench-fill foundations

Concrete foundations run beneath load-bearing walls. They can support foundation walls and a separately constructed ground floor. The ground, nearby trees, drainage, neighbouring structures and building loads influence the required design; there is no universal depth suitable for every site.

Pads and ground beams

Individual foundations support designed load points such as columns. Ground beams or another engineered supporting arrangement may connect them or carry walls between them. The structure and floor must be designed for the actual support positions and spans.

Ground screws

Steel screw foundations can support a designed arrangement of beams or bearers. Suitability depends on ground conditions, compression, uplift and lateral loads, durability and how installation and capacity are verified. Specify the exact system: different screw and helical pile products are not interchangeable.

Piled foundations

Specialist piles transfer loads into suitable ground at depth. A designed arrangement of caps, beams or other elements connects them to the building. This may be considered where a suitable shallow foundation is impractical, but ground information and engineering determine the solution.

Pads, padstones and loose blocks are not the same

A pad foundation is a designed foundation carrying a particular load into the ground. A padstone generally spreads a concentrated load, such as the end of a beam, into the supporting masonry or structure. It is not normally the foundation itself.

For some small garden structures, a designer may specify discrete supports on prepared, adequate ground. That does not make loose blocks or paving slabs a general substitute for a designed base. Ask what the supports bear onto, how movement is controlled and how the building is restrained.

What affects the choice?

  • The building’s use, size, height and structural loads, including wind uplift and sideways forces.
  • The type, strength and consistency of the ground, previous fill, groundwater and any identified ground hazards.
  • Trees, vegetation, drainage, slope and the foundations of nearby structures.
  • Access for excavation, concrete delivery or specialist equipment, and the location of buried services.
  • Finished floor level, insulation, damp protection, ventilation beneath raised floors and external ground levels.
  • The kit supplier’s support layout, dimensions, holding-down details and installation tolerances.

A site visit, survey or ground investigation may be needed before a foundation design can be confirmed. Photographs help with an initial discussion but do not establish what is beneath the surface.

How foundations relate to your building system

Building systemWhat needs coordinating
Timber frame and SIPsSupport to the designed walls, sole plates and structural members; floor levels; fixings; damp protection and insulation at the base.
Light steel frameSupport lines or points, holding-down connections, levels and the insulation and moisture details at the frame-to-base junction.
Modular buildings and podsActual module or host-building support positions, concentrated loads, connection zones and space for installation. A bathroom pod normally bears on the host building’s designed floor.
CLT, glulam and hybrid structuresPanel, beam and column bearing points, load transfer, movement allowances, connections and interfaces between different materials.
Precast concreteComponent weights and loads, bearings, setting-out tolerances and stability through the installation sequence.

These are coordination topics, not foundation selections. The same building system can use different foundations on different sites.

Is foundation work included in the kit quotation?

Only where expressly stated. A price for an offsite kit does not automatically include foundation design, groundworks or a finished base. BPM will identify the agreed scope and the work appointed to others.

Agree design responsibilities

  • Who obtains surveys and ground information.
  • Who designs the foundations and below-ground works.
  • Who provides the building loads and base connections.
  • Who coordinates the foundation, structural frame and floor details.

Agree the installation scope

  • Excavation, spoil removal and ground preparation.
  • Concrete, specialist foundations, beams and floor construction.
  • Drainage, service ducts and relevant damp or ground-gas measures.
  • Setting out, inspections, records and acceptance before kit delivery.

The route to a base ready for delivery

  1. 1. Establish the brief

    Confirm the intended building, outline design, site position and available ground information.

  2. 2. Coordinate the design

    The foundation and kit designers agree loads, supports, levels, tolerances, fixings and service penetrations.

  3. 3. Agree the order and programme

    Record the foundation scope, exclusions, appointed contractors and inspection points alongside the kit programme.

  4. 4. Construct and inspect

    Carry out the specified work and arrange the relevant inspections. Record dimensions, levels and any changes or unexpected ground conditions.

  5. 5. Confirm readiness

    Resolve outstanding issues and obtain the agreed confirmation that the base is ready. Only then confirm the kit delivery and installation arrangements.

Before the kit arrives

  • Check foundation dimensions, diagonals, support positions and finished levels against the coordinated drawings.
  • Confirm holding-down fixings and structural connections, including any items to be cast in.
  • Coordinate damp protection, insulation, external ground levels and finished floor levels.
  • Check drainage routes, service penetrations and access for subsequent trades.
  • Confirm inspection records, concrete readiness or specialist installation records as applicable.
  • Agree who accepts the base and how any discrepancies will be resolved before installation.

Do not assume a delivery team can correct an out-of-level or incorrectly sized base on the day. Early checks help prevent a stopped installation, additional handling and unplanned costs.

What should you send BPM?

  • Site postcode and the proposed position of the building.
  • Intended use, approximate size, system and drawings where available.
  • Existing foundation or slab details, with photographs and any records you have.
  • Surveys, ground reports, drainage information and known trees, slopes or access constraints.
  • Whether you need a kit only, foundation coordination, installation or wider project management.
  • Target dates and details of any designers or groundworks contractors already appointed.

If you already have a base, tell us before ordering. Its dimensions and condition alone may not confirm its structural suitability; the proposed building and existing construction need to be checked together.

Let’s talk about your project

Common questions

Are ground screws always the cheapest option?

No. Ground conditions, load requirements, access, installation equipment, bearers and the floor build-up affect the complete cost. Compare a defined scope rather than only a price per screw.

Can a garden building simply sit on padstones?

Only use a support arrangement specified for the particular structure and ground. A padstone generally spreads a load into another structure; it does not establish the bearing capacity of the ground beneath it.

Can we reuse an existing concrete base?

Possibly, after the relevant checks. The designer needs to consider its construction, condition, dimensions, levels and capacity for the proposed loads and fixings.

Does a foundation mean the building can be used as a home?

No. A foundation choice does not establish that the complete building is suitable for residential use. Intended use, design and the relevant project approvals must be considered together.