Offsite Kit Supply • planning guide
Preparing Your Enquiry
The drawings, site details and project information that help BPM prepare a useful response.
Plan your package
Preparing Your Enquiry
You do not need a manufacture-ready drawing set to start a conversation. Send the information you have, tell us its current stage and identify the decisions still to be made.
What BPM needs to prepare a quotation
Send what you have; we will identify the information still required. A concept-stage allowance and a manufacture-ready quotation have different levels of certainty.
- Project location and postcode, intended building use, number of storeys and approximate dimensions or floor area.
- Plans, elevations and sections, ideally with revision numbers; structural information, surveys and a specification if available.
- The system you are considering, or the outcome you need if you have not selected one.
- Supply only, supply and installation, or wider project management; identify the work already appointed to others.
- External finishes, windows and doors, insulation targets, roof form and any fire or acoustic requirements provided by your designer.
- Foundation proposals and ground information if available; access width, delivery restrictions, overhead obstructions and space for unloading or a crane.
- Target start and delivery dates, budget range and the stage of design and approvals.
- Your name, contact details and a short description of the help you want.
No final drawings yet?
We can start with a conversation about feasibility and likely scope. Final design, price and manufacture depend on enough coordinated information to define the package.
Common questions
Is an offsite kit a complete finished building?
Usually it is a defined structural or specialist package. The written inclusions determine whether insulation, windows, roofing, finishes or services are included. Ask where the package stops and the next trade starts.
Does offsite always cost less or finish sooner?
No. Factory preparation can reduce some site work and improve sequencing, but design time, transport, cranage, site conditions and the remaining trades affect the full cost and programme.
Can I change the layout after ordering?
Ask before making changes. Drawings and specifications are normally approved before manufacture. Revised openings, dimensions or services can affect engineering, factory work and delivery dates.
Are foundations and approvals included?
Only if the quotation expressly includes the relevant service. Foundation design responds to the ground and building loads; choosing a kit does not by itself resolve planning or building-control requirements.
Will BPM manufacture every component?
BPM’s role is to understand the brief and coordinate the agreed supply, installation or management route. The proposal identifies the appointed specialist supplier, design scope and responsibilities for your project.