Size and layout
Floor area, room arrangement, wall lengths, roof form and glazing affect the proposal.
Building specification
Structure, insulation, windows, doors, cladding and required performance influence cost.
Interior finishes
Kitchens, bathrooms, fitted furniture, flooring, lighting and decorative choices shape the budget.
Foundations and site works
Ground conditions, levels, excavation, drainage and any retaining works must be considered.
Services and connections
Electricity, water, foul drainage, heating, ventilation, data and any utility upgrades vary by site.
Access and approvals
Transport, lifting requirements, planning, technical design and professional input are part of the overall assessment.
Compare like with like
Ask whether quotations include foundations, installation, services, professional fees, VAT and the finishes needed for the intended use. Habitara pricing is quotation-based, with inclusions and exclusions identified.
View the illustrated guide

The written quotation and project agreement confirm the specification, scope and responsibilities for your building.
